Flooding of Maidenbower/Furnace Green bridleway

Ian

/ #5

2014-02-04 13:01

I suspect network rail have already inspected the bridge, but if it is unsound obviously work should be done. It has had water coming through for some time...

Preference should be put on providing an economic and effective solution to the flooding - improved drainage or raising the level of the path under the bridge to eliminate the depression there entirely.